Brand Name: DAN-FOSS
Model Number: EVR
Place of Origin: China (Mainland)
*Model EVR solenoid valve is a direct-operated or servo-operated valve,which is applicable to
one direction flow.
*Model EVR solenoid valve is used on the liquid, air suction or hot vaporpiping of a freezer,
cold store and air conditioning unit.
* The valve seat of Model EVR solenoid valve is well sealed with perfectsealing performance.
* Model EVR solenoid valves with various voltage solenoids are availableand the valve body
is universal.
*Both packed and separated Model EVR solenoid valves are available andit means the valve
body could be supplied separately from the solenoid.
Model | Connection Type | P(bar) |
Max.Operating Pressure(bar) |
Kv(m3/h) | ||
Flare | Welded | Min. |
Max.MOPD Liquid |
|||
EVR3-2 | 1/4 SAE | 1/4 ODF | 0 | 30 | 40 | 0.27 |
EVR3-3 | 3/8 SAE | 3/8 ODF | 0 | 0.27 | ||
EVR6-3 | 3/8 SAE | 3/8 ODF | 0.05 | 0.8 | ||
EVR6-4 | 1/2 SAE | 1/2 ODF | 0.8 | |||
EVR10-4 | 1/2 SAE | 1/2 ODF | 1.9 | |||
EVR10-5 | 5/8 SAE | 5/8 ODF | 1.9 | |||
EVR15-5 | 5/8 SAE | 5/8 ODF | 2.6 | |||
EVR15-6 | 3/4 SAE | 3/4 ODF | 2.6 | |||
EVR15-7 | -- | 7/8 ODF | 2.6 | |||
EVR20-7 | -- | 7/8 ODF | 5 | |||
EVR20-9 | -- | ODF | 5 | |||
EVR25-9 | -- | ODF | 0.2 | 10.5 | ||
EVR25-11 | -- | ODF | ||||
EVR32-11 | -- | ODF | 16 | |||
EVR32-13 | -- | ODF | ||||
EVR40-13 | -- | ODF | 21 | |||
EVR40-17 | -- | ODF |
Q1.What is our main product ?
A1: Our company is mainly engaged in the production and sale of Compressor ,Motor,
Component and Refrigerant and A/C spare parts.
Q2.When can I get the price ?
A2:We usually quote the price within 24 hours after your inquiry received, you can call us
directly if you urgent.
Q3.Can I get a sample to check the quality ?
A3: Yes, please contact us to confirm is we have stock and the sample charge, the sample
charge can return to you after you place your bulk order to us.
Q4.What is the Trade Term?
A4: We accept Ex-work factory , FOB Guangzhou, FOB NingBo or CIF, as your requirement.
Q5.How long is our Production leading time?
A5: It depends on your quantity, usually one container can finish within 10-15 days upon receive deposit in normal season, and 15- 25 days in our busy months. For small
order, we have stock.
Q6.What is the Payment term?
Q6:Paypal, bank T/T , westen union or L/C at sight all available for us, 30% Deposit for start
the production ,the balance before the shipment when goods are ready .
Q7. During shipping, if there is a damage to products, how do you get replacement?
A7: We will try to packing the goods well and choose good shipping anency to make sure the
goods safety, but if there is a damage to your goods, the shipping agency would be responsible .
If it is not a very serious problems,we will help you and compensate you the damaged parts.